≪   Prev. Next   ≫

Tread and stone steps on Sentinel Ridge

This section of tread was built in 2020. Hopefully the stairs and carefully cleaned tundra below the trail will help it stabilize quickly and remain stable over the long term.
— This section of tread was built in 2020. Hopefully the stairs and carefully cleaned tundra below the trail will help it stabilize quickly and remain stable over the long term.

Get the one you need:

File Size: 22.0 KB 85.4 KB 134.0 KB 578.9 KB 21.4 MB
Image Size: 300px 600px 750px 1600px Original

Embed

1. Select a size:


2. Cut and Paste:



Attribution and Copyright info

By Ground Truth Trekking

Content on this page is available under a Creative Commons Attribution license.